| 1 | Head toward E Main St on S Clinton St. Go for 100 feet. - go 0 mi |
| 2 | Turn right onto E Main St. Go for 0.1 miles. - go 0.1 mi |
| 3 | Turn left onto Ann Arbor St (M-52). Go for 10 miles. - go 10.3 mi |
| 4 | Turn right and take ramp onto I-94 E toward Ann Arbor. Go for 12 miles. - go 11.5 mi |
| 5 | Take exit #171/M-14/Plymouth to the left onto M-14 E. Go for 3.5 miles. - go 3.5 mi |
| 6 | Continue on US-23-BR N. Go for 1.5 miles. - go 1.5 mi |
| 7 | Continue on US-23 S. Go for 2 miles. - go 2 mi |
| 8 | Keep left onto M-14 E at exit #42 toward Plymouth/Livonia. Go for 15 miles. - go 15 mi |
| 9 | Take the I-96 West/Flint/I-275 N exit onto I-275 N. Go for 6 miles. - go 6 mi |
| 10 | Take exit #165/M-5 N/I-696/M-5 E/Grand River Ave/Port Huron onto Walter P Reuther Fwy (I-696 E) toward Port Huron. Go for 28 miles. - go 28.4 mi |
| 11 | Exit left onto I-94 E (partial toll road) toward Port Huron. Go for 47 miles. - go 46.9 mi |
| 12 | Continue on Blue Water Brg (HWY-402 E) (partial toll road). Go for 64 miles. - go 63.7 mi |
| 13 | Take ramp onto Macdonald-Cartier Fwy (HWY-401 E). Go for 32 miles. - go 31.8 mi |
| 14 | Take exit #235/HWY-403/Brantford/Hamilton/Niagara Falls onto HWY-403 E. Go for 40 miles. - go 39.9 mi |
| 15 | Take exit #64/Lincoln M. Alexander Parkway onto Lincoln M Alexander Pky East. Go for 7 miles. - go 6.8 mi |
| 16 | Continue on Red Hill Valley Pky North. Go for 5.5 miles. - go 5.4 mi |
| 17 | Take the Qew/Niagara exit onto Qew. Go for 36 miles. - go 35.8 mi |
| 18 | Keep left onto HWY-420 E at exit #30A toward The Falls/Niagara Falls U.S.A. Go for 2.5 miles. - go 2.5 mi |
| 19 | Turn right onto McDonald Ave. Go for 0.1 miles. - go 0.1 mi |
| 20 | Bear left onto Centre St. Go for 0.2 miles. - go 0.2 mi |
| 21 | Continue on Clifton Hl. Go for 100 feet. - go 0 mi |
| 22 | Your destination on Clifton Hl is on the right. The trip takes 311 miles and 5:01 h. |
When using any driving directions or map, it's a good idea to do a reality check and make sure the road still exists, watch out for construction, and follow all traffic safety precautions. This is only to be used as an aid in planning.