Changes for the Galleria.
Their, must be an underground parking lot at Dillards. Also, for the rest of the Galleria. Also, elevated parking lots at Dillards and the rest of the Galleria. This is due, to Westheimer Rd and Post Oak to become freeways, and the IH 610 to expand.
The parking lots, must become automated now and become hoover in 2014, for hoover vehicles.
Their, must be a pedestrian tunnel under IH 610, for Dillards. Their, must be a ped tunnel under Post Oak, between Dillards and the Galleria. Also, a skybridge between, Dillards and the Galleria. Dillards, must get a ped tunnel under Westheimer and West Alabama. The Galleria, must get 2 ped tunnels under Westheimer and another 2 under W Alabama, while 1 under Sage.
Dillards and the Galleria, must get electricity from liquefied natural gas.